Название практики Improving reclamation condition of arable land around West Karmakshi Collector Arrangement of springs to improve stock watering
Category Water resources Water resources
Tool Collector-drainage system Public participation principle
Field of application

• Use of water resources
• Use of land resources

Use of water resources

Usability of practice for adaptation to climate change Moderate Moderate
Implemented by
CAMP-Alatoo Public Foundation (PF)
Used by

Country: Kazakhstan

Province: Kyzylorda Region

District: Karmakshy District

Other settlement: a/o “Aktobe”, a/o “III International”

Country: Kyrgyzstan

Province: Chuy Region

District: Sokuluk District

Local specifics

The site is located in the lower reaches of the Syr Darya River (inter-riverbed depression strip)

The site is located in a semi-drought zone subject to acute shortage of water resources in summer period and land degradation

Practice usage period

Start date: 01.01.2010

End date: 31.12.2011

Start date: 01.01.2011

End date: 31.12.2011

Problem solved through this practice

Increasing secondary land salination, deterioration of col-lector and drainage system (CDS)

Extremely low water availability (supply) of pastures; the quantity of cattle in watering sites below standard; land erosion

Tools used in the practice

A set of measures to enhance land reclamation condition (collector cleaning using special equipment, reconstruction of hydraulic engineering installations, etc.)

Technology of springs arrangement for stock watering

Description of the practice and its results

Actions:
The capital repair of inter-farm West Karmakshi Collector (WKC) is necessitated by the fact that in its current condition the Collector didn't provide for timely drainage of drainages and discharge water from cropland in the Left-Bank Massif.

Results:

Financial and economic:
Increased crop productivity, mainly rice and forage crops

Technical:
Enhanced reclamation condition of land in the Left-Bank Massif

Actions:

At first, the exact location of water outcrop was identified and cleaned from mud.  15 meters below the outcrop, 3 interconnected water tubs were installed (each 1.8 m long, 0.5 m wide and 0.5 deep).  Each subsequent tub is located lower than the preceding one, thus, allowing water flowing down in the cascade manner.

Results:

Financial and economic:

Cattle gaining weight quicker.

Technical:

Improved water supply in the area, including for cattle watering.

Lessons learnt and recommendations made

Lessons learnt:
Allocation of resources for cleaning CDS proved more efficient than other target actions

Recommendations:
Regular and timely execution of running and capital collector cleaning is necessary to ensure its proper operation

Lessons learnt:

Collection of water in one place had been practiced since ancient times, but was forgotten over time.  Rehabilitation of traditional practices should be welcomed.

Recommendations:

Similar practices should be scaled-up and continued as they not only benefit the local population, but also allow enhancing water availability for wild animals and expanding hayfield meadows.

Source of practice

Domestic tools (outcomes of research by domestic R&D organizations)

Traditional tools transferred from generation to generation which demonstrate their relevance in modern conditions

Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

Brief information on the project
Funding source Ministry of Reclamation and Water Management of the Republic of Kazakhstan PF “CAMP-Alatoo”, local population
Information sources

WOCAT.net, Mr. Abdybek Asanaliyev (e-mail: asanaly61@mail.ru), Kyrgyz National Agriculture University, Bishkek

Contacts of a person, who filled this form

SIC ICWC

SIC ICWC

Form submission date 29.03.2018 30.03.2018