Интерактивная карта лучших практик

по использованию водных, земельных и энергетических ресурсов,
а также окружающей среды Центральной Азии

Сравнение практик

Название практики Increasing water supply of Aksa-Ayuliye District Set of hydro-reclamation measures
Категория Водные ресурсы Водные ресурсы
Инструмент Система повышения водообеспеченности Комплекс гидромелиоративных мер
Сфера использования практики

Use of water resources

  • Use of water resources
  • Use of land resources
  • Environmental protection
Пригодность практики для адаптации к изменению климата Умеренная Низкая
Кем реализована практика UNDP, UNECE and Water Resources Committee of the Ministry of Agriculture of the RK jointly with the Public Association “Association of Country Farms of Shet Dis-trict of Karaganda Region”
Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ)
Где использована практика

Страна: Казахстан

Область: Карагандинская

Район: Шетский

Другой населенный пункт: Aksa-Ayuliye Rural District

Страна: Туркменистан

Область: Марыйская

Район: Сакарчагинский

Другой населенный пункт: Zakhmet Daikhan Farm

Специфика местности, где использована практика

The site is located in the area of acute shortage of irrigation and drinking water

Sakar-Chaga District (area of 53,000 ha; population of 132,000 people) is located in the northwestern part of Mary Region in the Murgab River delta. The majority of local residents live in the oasis hosting 80% of settlements.

Когда использована практика

Дата начала: 01.01.2015

Дата окончания: 31.12.2015

Дата начала: 01.01.2009

Дата окончания: 31.12.2010

Проблема, которая решается применением практики

Acute shortage of irrigation water

Land salination represents the main challenge in the area due to improper irrigation technology and lack of drainage, in their turn leading to extremely low productivity. With time, the existing irrigation management system resulted in irrational use of water and land. While water distribution rates were calculated in a centralized manner depending on specific crops, in practice water supply monitoring is extremely poor – water supply (canals) infrastructure is inconsistent with farmers’ needs leading to excessive and, vice versa, insufficient watering of different sites. In addition, there exists an informal water payment system leading to the advantageous position of certain users.

Примененные в практике инструменты

Measures to restore natural springs: arrangement of stone protection fencing around springs and installation of water-release pipes

Set of hydro-reclamation measures: preventive land forming (leveling), composting, monitoring of ground water bedding and mineralization, decentralized water management planning, capacity building, etc.

Описание практики и ее результаты

Actions
For project purposes, 10 springs were selected still able to exert water to the surface. Project actions included arrangement of stone protection fencing around springs to prevent cattle from trampling the springs. To allow water release, drain pipes were installed in protection stone walls.

Results
Financial and economic:
The economic effect of livestock production and irriga-tion development exceeding 100,000 USD.

Technical
Enhanced (by up to 30-40%) supply of irrigation and drinking water in the area; drafted “Rules of Using General Use Water Facilities for Personal and Domestic Needs Located on the territory of the Rural District”.

Actions:

A series of measures were executed to prevent land degradation and improve land reclamation condition, including introduction of high-performance drainage systems and reclamation technologies, construction of a new collector and cleaning of the existing one, construction of 9 water-regulating and 2 water-measuring facilities.

Results:

  • 50 hectares of degraded land rehabilitated and can be used for agricultural purposes. About 35 ha of land saved from degradation thanks to preventive land forming;
  • regular seminars held for land users on potential ways of applying various advanced methods of maintaining rural economy and effective use of water resources;
  • about 60 measuring stations installed to monitor the level and mineralization of ground water.
Какие уроки и рекомендации можно извлечь из практики

Lessons learnt:
The practice demonstrated the advantages of restoring springs and the need to regularly maintain water bodies

Recommendations:
It is necessary to continue the efforts not only in Kazakhstan, but also across the region. For example, it is possible to rehabilitate multiple springs and water accumulators (like “sardoba” or underground “kyariz”) across all Central Asia.

Lessons learnt:

  • salinized land was rehabilitated not only thanks to reclamation actions but also by composting. In particular, high-quality humus is produced to enhance soil salinity parameters;
  • the process of designing water use plans for individual farmers launched;
  • one new collector built.

Recommendations:

It is necessary to focus on strengthening the role of local associations in rendering irrigation services and managing the canal’s water level.  Local water users will be rendered an opportunity to design effective irrigation water management schemes.  The experience of decentralized water planning and management accumulated by water tenants will be documented and distributed as a part of knowledge-management (capacity-building) strategy.  It is necessary to closely cooperate with the newly established Agriculture Advisory Service working on sustainable land and water management, as well as to disseminate corresponding practices in other areas.

Источник практики

Domestic tools (outcomes of research by domestic R&D organizations)

Domestic tools (outcomes of research by domestic R&D organizations)

Готовность практики к внедрению

1. Затраты на внедрение: Высокие

2. Примерная стоимость капиталовложений на 1 га:

3. Затраты на поддержание и эксплуатацию: Высокие

4. Экспертная поддержка: Не требуется

1. Затраты на внедрение: Высокие

2. Примерная стоимость капиталовложений на 1 га:

3. Затраты на поддержание и эксплуатацию: Высокие

4. Экспертная поддержка: Не требуется

Краткая информация о проекте

Project title: SaveH2Okz Project within the framework of the joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model”

Duration: 2015-2018

Project goal and objectives: raising awareness on the issue of water resources exhaustion with the aim of fostering “green economy” practices

Project beneficiaries: local population

Project implementer: Ministry of Agriculture of the Republic of Kazakhstan

Project title: Local-level capacity building and investment for sustainable management of land resources.

Project duration: 2009-2010.

Project goal and objectives: overcoming barriers to higher efficiency and performance of water supply systems in climate change induced drought conditions.

Project beneficiaries: Zakhmet Daikhan Farm (approximately 300 daikhan households).

Project implementer: Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ).

Источник финансирования практики European Union (grant) UNDP and Global Environmental Facility
Источники информации о практике

Joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model” sponsored by the European Union (saveh2o.kz)

http://www.turkmenistan.ru/?page_id=3&lang_id=ru&elem_id=17207&type=event&layout=print&sort=date_desc 

Контактные данные лица, заполнившего форму

SIC ICWC

SIC ICWC

Дата заполнения формы 29.03.2018 17.04.2018

Партнеры