Название практики | Introduction of Integrated Water Resources Management (IWRM) principles on the Aspara small transboundary river | Increasing water use efficiency on WUA and water user levels |
---|---|---|
Категория | Водные ресурсы | Водные ресурсы |
Инструмент | Принцип общественного участия | Техника и технология полива |
Сфера использования практики | Use of water resources |
|
Пригодность практики для адаптации к изменению климата | Высокая | Умеренная |
Кем реализована практика | USAID/CAREC |
Department of Water Management and Reclamation of the Ministry of Agriculture, Food Industry and Reclamation (MoAFIR) of the Kyrgyz Republic with the support of Helvetas Swiss Intercooperation |
Где использована практика |
Страна: Кыргызстан |
Страна: Кыргызстан Область: Джалал-Абадская |
Специфика местности, где использована практика | Transboundary river |
Water User Associations (WUAs) are located to the northwest of Jalal-Abad (region’s capital) on the border of Namangan and Andizhan Regions of Uzbekistan (Kugart River Valley, 1,200 m ASL, northern tail of the Fergana Valley). |
Когда использована практика |
Дата начала: 01.04.2012 Дата окончания: 31.10.2016 |
Дата начала: 01.01.2009 Дата окончания: 31.12.2017 |
Проблема, которая решается применением практики | Imperfections of the water management mechanism in the Isfara small transboundary river basin |
Low water use efficiency on WUA and farm levels |
Примененные в практике инструменты | The principle of stakeholder engagement in decision-making associated with water management of small transboundary river; IWRM planning technique |
Technical tools: Effective water use technologies, modern technologies of irrigation water management. Cognitive tools: Consultations by Helvetas Swiss Intercooperation and local experts, capacity-building training seminars. |
Описание практики и ее результаты | The Aspara River originates in the Western Tien Shan on the territory of Kyrgyzstan and flows northwards crossing the border with Kazakhstan. The river’s total length exceeds 44 km, and its catchment area amounts to approximately 66 km2. The Aspara River Basin is located in Chu Region in Kyrgyzstan’s northwest and Jambyl Region in Southern Kazakhstan. The basin is shared by several different ethnicities where they live and work. The basin’s population is rapidly growing, and the agriculture is developing. In many places along the course of the river, especially in its lower streams, the water doesn't meet quality and sanitary standards. Liquid waste produced by the population, industry and livestock production as well as solid waste constitute major sources of environmental pollution. Project efforts were carried out in Jambyl Region of the Republic of Kazakhstan and Chu Region of the Kyrgyz Republic. Actions: Establishment of 2 stakeholder groups, i.e. Small Basin Councils (SBC) – on both Kazakhstan’s and Kyrgyzstan’s sides of the river – representing local authorities, NGOs, water users and local communities. The SBCs already held 6 joint meetings proving the value of SBCs as platforms to exchange opinions and information as well as take joint decisions on enhancing the overall situation in the basin. In addition, hydrometric posts were reconstructed and underwent certification, and the automated water distribution and accounting system was installed on the Mailybai Canal. The water supply system in the village of Cholok-Aryk also underwent reconstructed. A demo-site to demonstrate drip irrigation equipment and technology was established on the premises of Ravshan Farm receiving its irrigation water via the Mailybai Canal. Results: Thus, the creation of national Small Basin Councils (SBC) on the Aspara River ensured a platform for exchanging opinions and information as well as joint decision-making to improve the overall situation in the Aspara River Basin, including the development of the IWRM basin-specific plan. |
Actions: Capacity building:
Partnership building:
Results: The practice promoted building of WUA capacities, increasing the efficiency of irrigation water use on farm level as well as building farmer capacities on water resources management. |
Какие уроки и рекомендации можно извлечь из практики | Lessons learnt: Introduction of IWRM principles is the pre-requisite of stable and fair water supply irrespective of a given water user’s location. Recommendations: Currently, when local stakeholders are represented in SBCs and are engaged in joint water management, it is necessary to continue the capacity-building efforts to build-up SBCs’ efficiency. In the long term, it might be necessary and possible to establish a joint body to manage the whole Aspara River Basin shared by Kazakhstan and Kyrgyzstan. |
Lessons learnt: Water shortage and inefficient water use (field/farm level) pose obstacles to farmers receiving high yields and incomes from agricultural production. Excessive irrigation in upper-stream areas and water shortage in lower-stream areas, although a paradox, occur simultaneously as farmers lack knowledge on actual crop water requirements and water-efficient irrigation. Recommendations: The practice should be scaled-up across the country. It is also necessary to conduct regular trainings to raise awareness among farmers and build their capacities on applying advanced irrigation methods providing them with an opportunity to manage scarce water resources more effectively. |
Источник практики | Foreign tools (transfer of foreign experience) |
|
Готовность практики к внедрению |
1. Затраты на внедрение: Высокие 2. Примерная стоимость капиталовложений на 1 га: 3. Затраты на поддержание и эксплуатацию: Высокие 4. Экспертная поддержка: Не требуется |
1. Затраты на внедрение: Высокие 2. Примерная стоимость капиталовложений на 1 га: 3. Затраты на поддержание и эксплуатацию: Высокие 4. Экспертная поддержка: Не требуется |
Краткая информация о проекте | Development and implementation of basin plans constitute principal elements of integrated water resources management. Multi-agency coordination mechanism via basin councils or coordination groups is an important advantage of IWRM. This approach allows streamlined coordination and synergy of actions on all levels of management hierarchy. Project title: Stakeholder partnership in joint policy-making: assistance to transboundary cooperation in small watersheds of Central Asia. Project duration: Apr 2012-Oct 2016 Project goal and objectives: introduction of the integrated water resources management (IWRM) practice in three transboundary watersheds and its scaling-up in Central Asia. Project beneficiaries: communities of the Aspara small transboundary river basin, specialists of water and environmental agencies, farmers. Project implementer: USAID/CAREC. |
Project title: Effective Water Use (SEP) (Kyrg. “Suunu effektivduu paidalanuu”) Project duration: 2009-2017 (9 years). Project goal and objectives: enhance water resources management frameworks and capacities in terms of rendering services to farmers with the aim of increasing their incomes, food security and capabilities to adapt to social, economic and climate risks; improve farmers knowledge and their abilities to apply advanced field-level irrigation and water collection methods providing them with an opportunity to manage scarce water resources more effectively. Project beneficiaries: water users (farmers) and WUAs. Project implementer: Department of Water Management and Reclamation of the MoAFIR of Kyrgyzstan |
Источник финансирования практики | USAID | Helvetas Swiss Intercooperation, Swiss Agency for Development and Cooperation |