Интерактивная карта лучших практик

по использованию водных, земельных и энергетических ресурсов,
а также окружающей среды Центральной Азии

Сравнение практик

Название практики Establishment of the Aravan-Akbura Main Canal Water User Union (AAMC-WUU) Accumulation of rain and runoff water via a series of cascading storage pools (small reservoirs)
Категория Водные ресурсы Водные ресурсы
Инструмент Принцип общественного участия Система повышения водообеспеченности
Сфера использования практики

Use of water resources

  • Use of water resources
  • Use of land resources
  • Environmental protection
Пригодность практики для адаптации к изменению климата Умеренная Высокая
Кем реализована практика Scientific and Information Center (SIC) of Interstate Commission for Water Coordination (ICWC) and Swiss Agency for Development and Cooperation (SDC)
Ministry of Water Management of Turkmenistan (4 res-ervoirs) and “Responding to climate change risks for dekhan farming system of Turkmenistan on national and local levels” Project (7 reservoirs)
Где использована практика

Страна: Кыргызстан

Область: Ошская

Район: Кара-Сууский

Страна: Туркменистан

Область: Ахалская

Специфика местности, где использована практика

Akbura River Basin

The settlements are located in the river catchment area; deep ground water occurrence; mountain valleys are under high risk of mudflows and floods.

Когда использована практика

Дата начала: 01.01.2007

Дата окончания: 31.12.2017

Дата начала: 01.01.2012

Дата окончания: 31.12.2013

Проблема, которая решается применением практики

Low level of coordination among WUAs – as a rule, each WUA liaises independently with its water management organization (WMO).

Water deficit; settlements and agricultural land under flood and mudflow threat during mudflow risk periods

Примененные в практике инструменты

Methods of integration and social mobilization

Cascading storage pools (reservoirs) accumulating rain and runoff water

Описание практики и ее результаты

The AAMC-WUU is an association of legal entities in the form of Union – a voluntary independent non-profit public organization uniting legal entities (i.e. WUAs) based on common interests with the aim of coordinating actions and protecting shared interests and rights.  AAMC-WUU operates as per the Charter approved at the general meeting of water user representatives, has its own stamp and bank account.

Actions:

The creation of AAMC-WUU began with the establishment of the Initiative Group (IG).  The IG consisted of active water specialists, representatives of water users and other stakeholders who saw the need to transit to IWRM.  Further on, the IG carried out social mobilization, drafted necessary documents (the Union’s Charter, etc.), organized the general meeting of water users that approved the Charter and established the Union’s Council (Board).  After that, AAMC-WUU underwent legal registration and officially launched its work.

Results:

  • AAMC-WUU established, legally registered and has been operating until present time;
  • AAMC-WUU contributed to the following:
    - enhanced stability and uniformity of water supply to WUAs via state WMO;
    - better collection of water supply service fees paid by WUAs to state WMO.
  • Representing the interests of water users as a member of the RMC Water Committee, AAMC-WUU also contributed to decreasing conflicts between WUAs and WMO.

Actions:

  • assessment of mudflow and flood risks and surveying local population regarding reservoirs’ locations and water uses (drinking and irrigation water supply);
  • designing reservoirs;
  • construction of reservoirs with the engagement of local residents;
  • training of local residents on servicing reservoirs and corresponding equipment.

Results:

  • reduced risks for public life and health;
  • enhanced water supply of irrigated land;
  • reduced risk of agricultural losses due to drought;
  • reduced risk of biodiversity damage caused by mudflows and floods;
  • enhanced public access to drinking water.
Какие уроки и рекомендации можно извлечь из практики

Lessons learnt:

The effectiveness of AAMC-WUU depends on internal and external conditions: capacities (financial, institutional, etc.) of its members (i.e. WUAs) and the level of democracy and market development in a given country.  In turn, the growth of capacities of AAMC-WUU members depends on AAMC-WUU performance.

Recommendation:

Currently, WUAs capacities are rather poor which is reflected in AAMC-WUA own underperformance.  Considering that WUA represent the weakest link in water hierarchy and the role of water users in addressing national food, water and environmental security needs, the government should find opportunities to support (first of all, financially) WUAs/AAMC-WUU during transition period (until they become self-sufficient).

  • Cascading reservoirs provide better cumulative effect at lower cost compared to separate reservoirs;
  • Application of modern water-proofing materials during the construction of storage pools (reservoirs) allows to reliably store winter and spring runoff to be used during vegetation period.
Источник практики

Foreign tools (transfer of foreign experience)

Domestic tools (outcomes of research by domestic R&D organizations)

Готовность практики к внедрению

1. Затраты на внедрение: Высокие

2. Примерная стоимость капиталовложений на 1 га:

3. Затраты на поддержание и эксплуатацию: Высокие

4. Экспертная поддержка: Не требуется

1. Затраты на внедрение: Умеренные

2. Примерная стоимость капиталовложений на 1 га: $50-500

3. Затраты на поддержание и эксплуатацию: Низкие

4. Экспертная поддержка: Требуется на стадии внедрения

Краткая информация о проекте

Project title: Integrated Water Resources Management in the Fergana Valley (IWRM-Fergana).

Project duration: Jan 01, 2001-Dec 31, 2012 (12 years).

Project goal and objectives: overall project goal was “to contribute to safer living, environmental sustainability and wide social harmony, to support rural restructuring in Central Asian countries by enhancing water resources management based on the example of the Ferghana Valley”.

Project beneficiaries: WUAs, farmers in project sites.

Project implementer: IWMI, SIC of the ICWC, Project Steering Committee (PSC) consisting of 3 representatives of the Ministries of Rural and Water Management (MRWM) of project target countries, 3 heads of Regional Water Administrations hosting project target sites.

Project title: Responding to climate change risks for dekhan farming system of Turkmenistan on national and local levels.

Project duration: 2012-2016.

Project goal and objectives: build the adaptation capacity to respond to climate change impacts, including variability on local and national levels.

Project beneficiaries: population of Garavul Settlement (about 6,000 people) and Konegumbez Settlement (about 1,000 people).

Project implementer: Ministry of Nature Conservation of Turkmenistan and UNDP

Источник финансирования практики Grant from the Swiss Government via SDC Adaptation Facility
Источники информации о практике

Guidelines on IWRM streamlining, Volume 1 (Institutional Aspects), Tashkent 2011.

Government of Turkmenistan

Контактные данные лица, заполнившего форму

SIC ICWC

SIC ICWC

Дата заполнения формы 02.04.2018 03.04.2018

Партнеры