Название практики Application of tubular outlet flowmeters Establishment and development of WUAs, enhancement of technical capacities of intra-farm irrigation and drainage infrastructure
Категория Водные ресурсы Водные ресурсы
Инструмент Средства и методы водоучета Принцип общественного участия

Другое: Methods of integrating water users and WUAs

Сфера использования практики

Use of water resources

Пригодность практики для адаптации к изменению климата Умеренная Умеренная
Кем реализована практика Institute of Water Issues, Hydropower and Ecology of the Academy of Sciences of the Republic of Tajikistan (IWIHE of the AS of the RTj)
Department of Water Management and Reclamation of the Ministry of Agriculture (MoA) of the Kyrgyz Republic with the support of the World Bank
Где использована практика

Страна: Таджикистан

Область: Хатлонская

Район: Джиликульский

Страна: Кыргызстан

Область: Таласская

Специфика местности, где использована практика
  • Located in the valley part of the Vakhsh River Basin (river catchment area);
  • Deep (below 3 meters) ground water occurrence;
  • Middle loamy soils.

Water User Associations (WUAs) are located in the western and central parts of the Tien Shan Mountains - from the Fergana Valley in the west to the central part of the Tien Shan in the east, from Kazakhstan in the north to the northern part of the Pamir in the south.  The territory of Kyrgyzstan stretches for 900 km from west to east and for 410 km from north to south (approximately between latitudes of 39N and 43N).

Scale of coverage: 450 WUAs with the serviced area of 736 000 ha; the intra-farm infrastructure consisting of 22.7 thous. km of irrigation canals (including 5.5 thous. km lined and in trays), 4.3 thous. km of open and closed collector and drainage networks, over 250 pools of daily and decade-based regulation, about 20 thous. units of hydro-engineering facilities.

Когда использована практика

Дата начала: 01.04.2010

Дата окончания: 31.10.2011

Дата начала: 01.01.2001

Дата окончания: 31.12.2013

Проблема, которая решается применением практики

Uneven distribution of irrigation water, lack of water accounting means to ensure observance of recommended irrigation norms for cotton

After the country obtained independence, collective and state farms split into multiple small household and country farms, and the water management sector of Kyrgyzstan faced typical transition challenges, including the following key ones:

  • absence of relevant standard legal and institutional frameworks, ambiguity of land and water rights regulations;
  • lack of financial means for operation and maintenance (O&M) and absence of water pricing policy;
  • wear of irrigation and drainage infrastructure that led to unreliable supply and distribution of irrigation water as well as issues associated with drainage and land flooding, etc.;
  • practically all intra-farm infrastructure consisting of irrigation canals, open and closed collector and drainage networks, hydro-engineering facilities were left “ownerless”.
Примененные в практике инструменты

Tubular water outlet flowmeter

  1. Methods of integrating water users and WUAs;
  2. Techniques of assessing the technical capacities of irrigation and drainage networks;
  3. Training seminars on different aspects of WUA activities (administration, financial management, water use, O&M of WUA irrigation infrastructure, legal framework of WUA operation and monitoring)
Описание практики и ее результаты

Actions:

- Construction of tubular water outlet flowmeter with removable nozzles (procurement of polyethylene piping to make tubular water outlets and matching nozzles);
- Installation of tubular water outlet flowmeter along temporary sprinklers. 

Results:

Financial and economic:

saving of irrigation water; low cost of irrigation system automation (total kit cost: $500/ha) with the service life of 5 years. 

Technical:

simple design allowing a more even distribution of irrigation water stream among furrows, thus, ensuring the prescribed water supply mode.

Social:

improved working conditions of irrigators; lower labor needs/costs; enhanced mutual trust among farmers and water users.

Actions:

Within the framework of the first World Bank Project “Intra-Farm Irrigation” (PVO-1), in the course of 5-6 years more than 450 WUAs were established which are currently independently servicing the intra-farm irrigation network supplying water to over 700 thous. ha of agricultural land. In addition, the intra-farm water supply networks of 354 WUAs were fully re-balanced from the books of rural administrations and other economic entities. 1,138 km of intra-farm irrigation and 142.3 km of collector and drainage networks, 32 day run-off ponds, 3,401 hydro-posts, etc. underwent rehabilitation.  Trainings on all aspects of WUA operation (administration, financial management, water use, O&M of WUA irrigation infrastructure, legal framework of WUA activities, monitoring) were conducted covering over 48 thous. WUA members. The Law of the KR “On Water User Unions (Associations)” was adopted (February 2002).

35 Water Management Councils covering 229.4 thous. ha of irrigated land were established. In addition, 14 Unions (Federations) of Water User Associations covering 121.7 thous. ha of irrigated land were created and underwent legal registration across the country. The purposes of such Unions are joint operation and technical maintenance of intra-farm networks located within their respective service zones.

In early 2008, the 2nd Project “Intra-Farm Irrigation” (PVO-2) was launched to extend further support to, build the capacity of and train about 500 WUAs in all regions of the republic.  Out of them, 29 WUAs covering the irrigated area of approx. 51,000 ha executed rehabilitation operations and upgraded their irrigation and drainage systems.

Within the framework of implementing this practice, WUAs received assistance to ensure their ability to effectively and productively use the rehabilitated intra-farm irrigation systems in a sustainable manner with the special focus on water resources and assets management.

Results:

The practice facilitated capacity building of WUAs, improving of water resources management by WUAs as well as enhancing the technical capacities of intra-farm and drainage infrastructure.

Какие уроки и рекомендации можно извлечь из практики

Lessons learnt:

Installation and deployment of tubular water outlet flowmeter allows to improve the uniformity of irrigation stream’s distribution among furrows and conduct irrigation water accounting.

Recommendations:

It is necessary to widely use the small-scale irrigation automation means like the tubular water outlet flowmeters which have simple design, are convenient to operate, are low-cost and mobile and ensure supply of the prescribed amount of irrigation water.

Lessons learnt:

The newly established farm-level institutions – Water User Associations – ensure uniform and stable delivery of irrigation water from state water management organizations to final water users.

Recommendations:

At present, the capacities of WUAs as well as WUA Unions (Federation) are rather low.  Considering the fact that WUAs represent the weakest link in water hierarchy and the role of water users in addressing the tasks of national food, water and environmental security, the government should find ways to support (first of all, financially) WUAs and WUA Unions (Federations).  Training of WUA personnel on all aspects of associations’ activities should be carried out on annual basis.

Источник практики

Domestic tools (outcomes of research by domestic R&D organizations)

  • Domestic tools (outcomes of research by domestic R&D organizations);
  • Foreign tools (transfer of foreign experience)
Готовность практики к внедрению

1. Затраты на внедрение: Высокие

2. Примерная стоимость капиталовложений на 1 га:

3. Затраты на поддержание и эксплуатацию: Высокие

4. Экспертная поддержка: Не требуется

1. Затраты на внедрение: Высокие

2. Примерная стоимость капиталовложений на 1 га:

3. Затраты на поддержание и эксплуатацию: Высокие

4. Экспертная поддержка: Не требуется

Краткая информация о проекте

Project title: Watering technology based on tubular water outlet flowmeters.

Project duration: Apr 2010-Oct 2011.

Project goal and objectives: development and deployment of a crop watering technology for dekhan farms of the Republic of Tajikistan allowing to significantly increase the efficiency of water use.

Project beneficiaries: members of “Istikol” WUA (Water User Association).

Project implementer: Institute of Water Issues, Hydropower and Ecology of the Academy of Sciences of the RTj

Project title: Intra-Farm Irrigation (PVO-1 and PVO-2).

Project duration: 2001-2013 (13 years).

Project goal and objectives: establish, develop and strengthen WUAs as well as rehabilitate intra-farm irrigation and drainage infrastructure.

Project beneficiaries: water users and WUAs.

Project implementer: Department of Water Management and Reclamation of the MoA of Kyrgyzstan

Источник финансирования практики “Tajikistan Water Partnership” NGO World Bank
Источники информации о практике

Report by the Innovation Technology Department of the IWIHE of the AS of the RTj, Dushanbe, 2012, 45 p.

Online publications:

  1. Report on performance assessment of water user associations in southern regions of the Kyrgyz Republic, 2010 (www.osce.org/ru/);
  2. Presentation “Intra-Farm Irrigation Project” by Training Specialist Mr. O. Segizbayev (www.myshared.ru);
  3. Specialists of the Department of Water Management of the Ministry of Agriculture examined the experience of Spain and Portugal on irrigation system management methods (more details on www.eecca-water.net);
  4. Case studies: establishment of WUAs in Kyrgyzstan (more details on www.gender.cawater-info.net);
  5. Presentation “Intra-Farm Irrigation Project” by Project Manager Mr. N. Dzhailobayev (download presentation);
  6. “Projects and Programs in the Agricultural Sector” Bulletin, December 2008 (www.refdb.ru).
Контактные данные лица, заполнившего форму

SIC ICWC

SIC ICWC

Дата заполнения формы 02.04.2018 18.05.2018