Interactive map of the best practices

on the use of water, land and energy resources,
as well as the environment of Central Asia

Comparison of practices

Название практики Set of hydro-reclamation measures Энерго-ресурсосберегающая технология откачки подземных вод по обсадной колонне скважины
Category Water resources Water resources
Tool Set of hydro-reclamation measures

Other: Энерго-ресурсосберегающая технология откачки подземных вод

Field of application
  • Use of water resources
  • Use of land resources
  • Environmental protection
  • Использование водных ресурсов
  • Использование земельных ресурсов
Usability of practice for adaptation to climate change Low Moderate
Implemented by Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ)
Казахский научно-исследовательский институт водного хозяйства
Used by

Country: Turkmenistan

Province: Mary Region

District: Sakarçäge District

Other settlement: Zakhmet Daikhan Farm

Country: Kazakhstan

Province: Jambyl Region

Local specifics

Sakar-Chaga District (area of 53,000 ha; population of 132,000 people) is located in the northwestern part of Mary Region in the Murgab River delta. The majority of local residents live in the oasis hosting 80% of settlements.

Скважины подземных вод с диаметрами обсадных колонн от 219 до 426.

Practice usage period

Start date: 01.01.2009

End date: 31.12.2010

Start date: 01.01.2010

End date: 30.12.2012

Problem solved through this practice

Land salination represents the main challenge in the area due to improper irrigation technology and lack of drainage, in their turn leading to extremely low productivity. With time, the existing irrigation management system resulted in irrational use of water and land. While water distribution rates were calculated in a centralized manner depending on specific crops, in practice water supply monitoring is extremely poor – water supply (canals) infrastructure is inconsistent with farmers’ needs leading to excessive and, vice versa, insufficient watering of different sites. In addition, there exists an informal water payment system leading to the advantageous position of certain users.

Увеличение дебита скважин, экономия до 30% на эксплуатацию скважины за счет исключения водоподъемных труб.

Tools used in the practice

Set of hydro-reclamation measures: preventive land forming (leveling), composting, monitoring of ground water bedding and mineralization, decentralized water management planning, capacity building, etc.

Технология откачки подземных вод по обсадной колонне скважины.

Description of the practice and its results

Actions:

A series of measures were executed to prevent land degradation and improve land reclamation condition, including introduction of high-performance drainage systems and reclamation technologies, construction of a new collector and cleaning of the existing one, construction of 9 water-regulating and 2 water-measuring facilities.

Results:

  • 50 hectares of degraded land rehabilitated and can be used for agricultural purposes. About 35 ha of land saved from degradation thanks to preventive land forming;
  • regular seminars held for land users on potential ways of applying various advanced methods of maintaining rural economy and effective use of water resources;
  • about 60 measuring stations installed to monitor the level and mineralization of ground water.

Устройство беструбного подъема воды по обсадной колонне скважины было разработано и апробировано ТОО «КазНИИВХ» на более чем 1000 водозаборных скважинах различного назначения, имеется руководство по эксплуатации. Изобретение защищено авторским свидетельством СССР №1633864, патентами №22926, 24313, 26090, АО «Казахский Водоканал» включил данную разработку в типовой проект ТП РК 1-12ВС СКВ-2009 «Водозаборные сооружения из подземных источников (скважин) производительностью от 1 до 12 м3/ч»

Мероприятия:

Внедрение новой ресурсосберегающей технологии эксплуатации скважин вертикального дренажа с повторным использованием дренажных вод на орошаемых массивах Южно-Казахстанской области» проводятся работы по внедрению технологии и технических средств откачки подземных вод по обсадной колонне скважины.

Результаты:

Внедрение в технологический процесс

Lessons learnt and recommendations made

Lessons learnt:

  • salinized land was rehabilitated not only thanks to reclamation actions but also by composting. In particular, high-quality humus is produced to enhance soil salinity parameters;
  • the process of designing water use plans for individual farmers launched;
  • one new collector built.

Recommendations:

It is necessary to focus on strengthening the role of local associations in rendering irrigation services and managing the canal’s water level.  Local water users will be rendered an opportunity to design effective irrigation water management schemes.  The experience of decentralized water planning and management accumulated by water tenants will be documented and distributed as a part of knowledge-management (capacity-building) strategy.  It is necessary to closely cooperate with the newly established Agriculture Advisory Service working on sustainable land and water management, as well as to disseminate corresponding practices in other areas.

Уроки:

Использование обсадных труб скважин в качестве водоподъемных исключает финансовые средства, направляемые на приобретение водоподъемных труб и снижает эксплуатационные затраты, повышает производительность труда при эксплуатации водозаборов, а также улучшает санитарно-эпидемиологическую обстановку. Увеличивает дебит скважин на 30%.

Рекомендации:

Внедрять энерго-ресурсосберегающую технологию откачки подземных вод по обсадной колонне скважины в технологический процесс эксплуатации обводнительных сооружений.

Source of practice

Domestic tools (outcomes of research by domestic R&D organizations)

Отечественные инструменты (результат разработок отечественных научно-исследовательских структур)

Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: Moderate

2. Approximate cost of investment per 1 ha:

3. O&M costs: Moderate

4. Expert support: Not needed

Brief information on the project

Project title: Local-level capacity building and investment for sustainable management of land resources.

Project duration: 2009-2010.

Project goal and objectives: overcoming barriers to higher efficiency and performance of water supply systems in climate change induced drought conditions.

Project beneficiaries: Zakhmet Daikhan Farm (approximately 300 daikhan households).

Project implementer: Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ).

Название: Энерго-ресурсосберегающая технология откачки подземных вод по обсадной колонне скважины - энерго-ресурсосберегающая технология откачки подземных вод по обсадной колонне скважины

Продолжительность: Январь 2010-Декабрь 2012 гг. (3 года)

Цели и задачи: Целью проекта является внедрение энерго-ресурсосберегающей технологии откачки подземных вод по обсадной колонне скважины

Масштаб внедрения и получатели выгод от его реализации: Отгонные паспища РК

Агентство по реализации: ТОО «КазНИИВХ»

Донор: нет

Funding source UNDP and Global Environmental Facility Грант МОН РК
Information sources

http://www.turkmenistan.ru/?page_id=3&lang_id=ru&elem_id=17207&type=event&layout=print&sort=date_desc 

  1. Григорьев В.М., Ваккумное водопонижение, М., Стройиздат, 1973. -223 с.Григорьев В.М., Ваккумное водопонижение, М., Стройиздат, 1973. -223 с.2.
  2. Гуринович А.Д., Гладков В.Д., Желобовский А.Г., Эффективность применения устройств беструбной подвески погружных электронасосов на водозаборных скважинах, Минск, БелНИИНТИ, 1979. -34 с.
  3. Гуринович А.Д., Желобовский А.Г., Теоретическое обоснование применения беструбного водоподъема / В кн. «Пути совершенствования проектирования, строительства и эксплуатации объектов сельскохозяйственного назначения», М., 1977.
Contacts of a person, who filled this form

SIC ICWC

Тумлерт В.А.

Телефон: +7 701 914 4739

Электронный адрес: tumlert_e@mail.ru

Form submission date 17.04.2018 20.05.2022

Partners