Interactive map of the best practices

on the use of water, land and energy resources,
as well as the environment of Central Asia

Comparison of practices

Название практики Increasing water supply of Aksa-Ayuliye District Holding the Integrated Water Resources Management Olympiad (Academic Competition)
Category Water resources Water resources
Tool System for enhancing water availability
Field of application

Use of water resources

Use of water resources

Usability of practice for adaptation to climate change Moderate Low
Implemented by UNDP, UNECE and Water Resources Committee of the Ministry of Agriculture of the RK jointly with the Public Association “Association of Country Farms of Shet Dis-trict of Karaganda Region”
Kyrgyz-Russian Slavic University (KRSU)
Used by

Country: Kazakhstan

Province: Karaganda Region

District: Shet District

Other settlement: Aksa-Ayuliye Rural District

Country: Kyrgyzstan

Local specifics

The site is located in the area of acute shortage of irrigation and drinking water

Practice usage period

Start date: 01.01.2015

End date: 31.12.2015

Start date: 01.02.2017

End date: 31.12.2017

Problem solved through this practice

Acute shortage of irrigation water

Insufficient level of objectivity while selecting candidates, i.e. selection of final candidates not based on their knowledge and skills but illicitly

Tools used in the practice

Measures to restore natural springs: arrangement of stone protection fencing around springs and installation of water-release pipes

Technique of knowledge assessment

Description of the practice and its results

Actions
For project purposes, 10 springs were selected still able to exert water to the surface. Project actions included arrangement of stone protection fencing around springs to prevent cattle from trampling the springs. To allow water release, drain pipes were installed in protection stone walls.

Results
Financial and economic:
The economic effect of livestock production and irriga-tion development exceeding 100,000 USD.

Technical
Enhanced (by up to 30-40%) supply of irrigation and drinking water in the area; drafted “Rules of Using General Use Water Facilities for Personal and Domestic Needs Located on the territory of the Rural District”.

Actions:

The participants were offered to undergo 2 exams (written and oral) within the framework of the Olympiad.  Finalists of the written test could go on to the oral exam.

Results:

1 student was selected from among the candidates to participate in subsequent Regional IWRM Olympiad and the International Summer School “Methods and Means of Assessing, Modelling and Monitoring the Water and Land Resources of Central Asia” to take place in Almaty City.

Lessons learnt and recommendations made

Lessons learnt:
The practice demonstrated the advantages of restoring springs and the need to regularly maintain water bodies

Recommendations:
It is necessary to continue the efforts not only in Kazakhstan, but also across the region. For example, it is possible to rehabilitate multiple springs and water accumulators (like “sardoba” or underground “kyariz”) across all Central Asia.

Formally, this competitive practice is routine while selecting the personnel/specialists for international and national projects, but their unbiased selection is not achieved in all cases. Quite often, various types of project participants are selected by way of “pulling strings” or based on the instruction of upper-tier agencies.

Source of practice

Domestic tools (outcomes of research by domestic R&D organizations)

  • Domestic tools (outcomes of research by domestic R&D organizations),
  • Foreign tools (transfer of foreign experience)
Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

Brief information on the project

Project title: SaveH2Okz Project within the framework of the joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model”

Duration: 2015-2018

Project goal and objectives: raising awareness on the issue of water resources exhaustion with the aim of fostering “green economy” practices

Project beneficiaries: local population

Project implementer: Ministry of Agriculture of the Republic of Kazakhstan

Funding source European Union (grant) Ministry of Education and Science of the Kyrgyz Repub-lic, Global Water Partnership (GWP) in Kyrgyzstan
Information sources

Joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model” sponsored by the European Union (saveh2o.kz)

http://www.water.kg/index.php/ru/itemlist/category/93-seminary-i-treningi 

Contacts of a person, who filled this form

SIC ICWC

SIC ICWC

Form submission date 29.03.2018 30.03.2018

Partners