Название практики Increasing water supply of Aksa-Ayuliye District Electronic Water Current Meter (ISV-1)
Category Water resources Water resources
Tool System for enhancing water availability Means and methods of water accounting
Field of application

Use of water resources

Use of water resources

Usability of practice for adaptation to climate change Moderate Low
Implemented by UNDP, UNECE and Water Resources Committee of the Ministry of Agriculture of the RK jointly with the Public Association “Association of Country Farms of Shet Dis-trict of Karaganda Region”
Irrigation and Water Issues Research Institute with Tashkent Institute of Irrigation Engineering and Agriculture Mechanization (TIIEAM)
Used by

Country: Kazakhstan

Province: Karaganda Region

District: Shet District

Other settlement: Aksa-Ayuliye Rural District

Country: Uzbekistan

Province: Tashkent Region

Local specifics

The site is located in the area of acute shortage of irrigation and drinking water

Chirchik River Basin, Zarafshan River Basin, mid-streams of Syr Darya River Basin, mid- and lower streams of the Amu Darya River

Practice usage period

Start date: 01.01.2015

End date: 31.12.2015

Start date: 01.01.2015

End date: 31.12.2017

Problem solved through this practice

Acute shortage of irrigation water

Until today, hydrometric revolver meters (GR-21) with propeller blade and contact mechanism are generally used.  These mechanisms are difficult to operate and require special skills and knowledge on behalf of personnel.  GR-21 hydrometric revolver meters possess certain essential flaws, including the following:

  • need for individual calibration (speed) execution and subsequent check-up of which requires an expensive test stand;
  • lack of continuous measuring capacity;
  • operating requires complete dismantling, cleaning and lubrication after each use, etc.;
  • presence of mechanically rubbing details in design unprotected from harmful effects of water;
  • impromptness of water speed (current) data.
Tools used in the practice

Measures to restore natural springs: arrangement of stone protection fencing around springs and installation of water-release pipes

Electronic Water Current Meter (ISV-1)

Description of the practice and its results

Actions
For project purposes, 10 springs were selected still able to exert water to the surface. Project actions included arrangement of stone protection fencing around springs to prevent cattle from trampling the springs. To allow water release, drain pipes were installed in protection stone walls.

Results
Financial and economic:
The economic effect of livestock production and irriga-tion development exceeding 100,000 USD.

Technical
Enhanced (by up to 30-40%) supply of irrigation and drinking water in the area; drafted “Rules of Using General Use Water Facilities for Personal and Domestic Needs Located on the territory of the Rural District”.

ISV-1 is universal and easy to use.  Measurements are presented on the display in digital form and in speed units.  Use of the electronic device for measuring water speed and, based on it, water consumption facilitates the work of hydro-accountants.

Device characteristics:

  • no rubbing details in the design;
  • no requirement for preliminary and subsequent periodic calibration;
  • measurement results do not depend on changes in physical composition and properties of water;
  • simplifies the process of water speed measuring and, therefore, water consumption accounting;
  • available in stationary and portable designs;
  • measurement error is comparable to this of the widely used GR-21;
  • small overall dimensions and weight;
  • relatively low cost, etc.

 The device is universal and its measurement results do not depend on water composition and properties, except for temperature (desired range 0 to +30°C). The device underwent successful testing and was deployed in 5 Basin Irrigation System Administrations (BISA): Chirchik-Akhangaran BISA, Zarafshan BISA, Syr Darya-Sokh BISA, Amu-Surkhan BISA, Lower Amu Darya BISA.

Actions:

  • manufacturing of 5 ISV-1 devices;
  • training of BISA hydro-accountants on device operation and use.

Results:

  • 5 above-stated BISAs accepted (acceptance certificate) and are presently using them;
  • the device’s testing is continuing for different irrigation system conditions;
  • the device developers continue receiving positive feedback from leading hydro-accountants;
  • at present, the works to enhance and certify the device are in progress.
Lessons learnt and recommendations made

Lessons learnt:
The practice demonstrated the advantages of restoring springs and the need to regularly maintain water bodies

Recommendations:
It is necessary to continue the efforts not only in Kazakhstan, but also across the region. For example, it is possible to rehabilitate multiple springs and water accumulators (like “sardoba” or underground “kyariz”) across all Central Asia.

Lessons learnt:

Application of the device increases the efficiency of data collection compared to the currently used equipment, as well as promotes rational and effective use of water resources due to higher accuracy, reliability and efficiency of irrigation water accounting data and saving of material and labor resources.

Recommendations:

The device is recommended for use on large canals and collector facilities as well as intra-farm water supply networks.  Today, the majority of WUAs do not have revolver meters or other water-measuring devices in their disposal, so fitting them with such units would improve WUAs overall technical capacities.

With the ongoing acute deficit of hydro-accountants, any technical college graduate would be able to use ISV-1.

Source of practice

Domestic tools (outcomes of research by domestic R&D organizations)

Domestic tools (outcomes of research by domestic R&D organizations)

Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: Moderate

2. Approximate cost of investment per 1 ha: $1000

3. O&M costs: Low

4. Expert support: Needed at implementation stage

Brief information on the project

Project title: SaveH2Okz Project within the framework of the joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model”

Duration: 2015-2018

Project goal and objectives: raising awareness on the issue of water resources exhaustion with the aim of fostering “green economy” practices

Project beneficiaries: local population

Project implementer: Ministry of Agriculture of the Republic of Kazakhstan

Project title: Commercial contract engagement with 5 BISAs.

Project duration: 2015-2017.

Project goal and objectives: create an easy-to-operate tool to measure water speed (current) within the 0.2-5.0 m/s range for deployment on facilities of the Ministry of Agriculture and Water Management (MAWM) of the RUz.

Project beneficiaries: BISAs of the MAWM of the RUz.

Project implementer: Head Water Administration (HWA) of the MAWM of the RUz.

Funding source European Union (grant) Government of Uzbekistan
Information sources

Joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model” sponsored by the European Union (saveh2o.kz)

Operator manual for the electronic device “Water Speed Measuring Unit”, 2015.