Название практики | Arrangement of springs to improve stock watering | Improving the reclamation condition of land along the Darialyk Collector |
---|---|---|
Category | Water resources | Water resources |
Tool | Public participation principle | Collector-drainage system |
Field of application | Use of water resources |
|
Usability of practice for adaptation to climate change | Moderate | Low |
Implemented by | CAMP-Alatoo Public Foundation (PF) |
State Program |
Used by |
Country: Kyrgyzstan Province: Chuy Region District: Sokuluk District |
Country: Turkmenistan Province: Daşoguz Region |
Local specifics | The site is located in a semi-drought zone subject to acute shortage of water resources in summer period and land degradation |
Lower reaches of the Amu Darya River Basin |
Practice usage period |
Start date: 01.01.2011 End date: 31.12.2011 |
Start date: 01.01.2009 End date: 31.12.2015 |
Problem solved through this practice | Extremely low water availability (supply) of pastures; the quantity of cattle in watering sites below standard; land erosion |
Expanding salination of irrigated land |
Tools used in the practice | Technology of springs arrangement for stock watering |
Set of measures to enhance the reclamation condition of land (motorized cleaning of the collector, reconstruction of hydro-technical facilities, etc.). |
Description of the practice and its results | Actions: At first, the exact location of water outcrop was identified and cleaned from mud. 15 meters below the outcrop, 3 interconnected water tubs were installed (each 1.8 m long, 0.5 m wide and 0.5 deep). Each subsequent tub is located lower than the preceding one, thus, allowing water flowing down in the cascade manner. Results: Financial and economic: Cattle gaining weight quicker. Technical: Improved water supply in the area, including for cattle watering. |
Actions: A set of measures to rehabilitate the Darialyk Collector executed to improve land reclamation condition. Results: The executed actions allowed lowering the level of ground water occurrence, thus, enhancing the overall land reclamation condition in target area as well as improving water drainage in adjacent areas. |
Lessons learnt and recommendations made | Lessons learnt: Collection of water in one place had been practiced since ancient times, but was forgotten over time. Rehabilitation of traditional practices should be welcomed. Recommendations: Similar practices should be scaled-up and continued as they not only benefit the local population, but also allow enhancing water availability for wild animals and expanding hayfield meadows. |
Lessons learnt: Lowered ground water level and improved reclamation status of irrigated land allowed tenant farmers and daikhan (farmer) associations in Dashoguz Velayat (Region) to increase crop productivity and, thus, gain additional income. Recommendations: Major project efforts to enhance the overall land condition in the target area resulted in improved public welfare. The practice can benefit from the relevant Uzbekistan’s experience (systemic cleaning of collectors) – cleaning of intra-farm water supply networks simultaneously with inter-farm and/or main collector systems. Uzbekistan’s model demonstrated sharp improvement of reclamation condition of entire land massifs. Ecosystems are extremely vulnerable and without proper care future generations will have to take much more effort and spend more resources to restore them. |
Source of practice | Traditional tools transferred from generation to generation which demonstrate their relevance in modern conditions |
Domestic tools (outcomes of research by domestic R&D organizations) |
Readiness for implementation |
1. Cost of implementation: High 2. Approximate cost of investment per 1 ha: 3. O&M costs: High 4. Expert support: Not needed |
1. Cost of implementation: High 2. Approximate cost of investment per 1 ha: 3. O&M costs: High 4. Expert support: Not needed |
Brief information on the project | Project title: Reconstruction of the Darialyk Interstate Collector (including water inlets). Project duration: 2009-2016. Project goal and objectives: improving passage of drainage water. Project beneficiaries: water consumers of all levels in the area supplied by the Darialyk Collector. Project implementer: Republic of Turkmenistan |
|
Funding source | PF “CAMP-Alatoo”, local population | Government of Turkmenistan |
Information sources | WOCAT.net, Mr. Abdybek Asanaliyev (e-mail: asanaly61@mail.ru), Kyrgyz National Agriculture University, Bishkek |
ASBP-3 Project |
Contacts of a person, who filled this form | SIC ICWC |
SIC ICWC |
Form submission date | 30.03.2018 | 04.04.2018 |