Название практики Introduction of Integrated Water Resources Management (IWRM) principles on the Aspara small transboundary river Set of hydro-reclamation measures
Category Water resources Water resources
Tool Public participation principle Set of hydro-reclamation measures
Field of application

Use of water resources

  • Use of water resources
  • Use of land resources
  • Environmental protection
Usability of practice for adaptation to climate change High Low
Implemented by USAID/CAREC
Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ)
Used by

Country: Kyrgyzstan

Country: Turkmenistan

Province: Mary Region

District: Sakarçäge District

Other settlement: Zakhmet Daikhan Farm

Local specifics

Transboundary river

Sakar-Chaga District (area of 53,000 ha; population of 132,000 people) is located in the northwestern part of Mary Region in the Murgab River delta. The majority of local residents live in the oasis hosting 80% of settlements.

Practice usage period

Start date: 01.04.2012

End date: 31.10.2016

Start date: 01.01.2009

End date: 31.12.2010

Problem solved through this practice

Imperfections of the water management mechanism in the Isfara small transboundary river basin

Land salination represents the main challenge in the area due to improper irrigation technology and lack of drainage, in their turn leading to extremely low productivity. With time, the existing irrigation management system resulted in irrational use of water and land. While water distribution rates were calculated in a centralized manner depending on specific crops, in practice water supply monitoring is extremely poor – water supply (canals) infrastructure is inconsistent with farmers’ needs leading to excessive and, vice versa, insufficient watering of different sites. In addition, there exists an informal water payment system leading to the advantageous position of certain users.

Tools used in the practice

The principle of stakeholder engagement in decision-making associated with water management of small transboundary river; IWRM planning technique

Set of hydro-reclamation measures: preventive land forming (leveling), composting, monitoring of ground water bedding and mineralization, decentralized water management planning, capacity building, etc.

Description of the practice and its results

The Aspara River originates in the Western Tien Shan on the territory of Kyrgyzstan and flows northwards crossing the border with Kazakhstan.  The river’s total length exceeds 44 km, and its catchment area amounts to approximately 66 km2.  The Aspara River Basin is located in Chu Region in Kyrgyzstan’s northwest and Jambyl Region in Southern Kazakhstan.  The basin is shared by several different ethnicities where they live and work.  The basin’s population is rapidly growing, and the agriculture is developing.  In many places along the course of the river, especially in its lower streams, the water doesn't meet quality and sanitary standards.  Liquid waste produced by the population, industry and livestock production as well as solid waste constitute major sources of environmental pollution.

Project efforts were carried out in Jambyl Region of the Republic of Kazakhstan and Chu Region of the Kyrgyz Republic.

Actions:

Establishment of 2 stakeholder groups, i.e. Small Basin Councils (SBC) – on both Kazakhstan’s and Kyrgyzstan’s sides of the river – representing local authorities, NGOs, water users and local communities.  The SBCs already held 6 joint meetings proving the value of SBCs as platforms to exchange opinions and information as well as take joint decisions on enhancing the overall situation in the basin.

In addition, hydrometric posts were reconstructed and underwent certification, and the automated water distribution and accounting system was installed on the Mailybai Canal. The water supply system in the village of Cholok-Aryk also underwent reconstructed.  A demo-site to demonstrate drip irrigation equipment and technology was established on the premises of Ravshan Farm receiving its irrigation water via the Mailybai Canal.

Results:

Thus, the creation of national Small Basin Councils (SBC) on the Aspara River ensured a platform for exchanging opinions and information as well as joint decision-making to improve the overall situation in the Aspara River Basin, including the development of the IWRM basin-specific plan.

Actions:

A series of measures were executed to prevent land degradation and improve land reclamation condition, including introduction of high-performance drainage systems and reclamation technologies, construction of a new collector and cleaning of the existing one, construction of 9 water-regulating and 2 water-measuring facilities.

Results:

  • 50 hectares of degraded land rehabilitated and can be used for agricultural purposes. About 35 ha of land saved from degradation thanks to preventive land forming;
  • regular seminars held for land users on potential ways of applying various advanced methods of maintaining rural economy and effective use of water resources;
  • about 60 measuring stations installed to monitor the level and mineralization of ground water.
Lessons learnt and recommendations made

Lessons learnt:

Introduction of IWRM principles is the pre-requisite of stable and fair water supply irrespective of a given water user’s location.

Recommendations:

Currently, when local stakeholders are represented in SBCs and are engaged in joint water management, it is necessary to continue the capacity-building efforts to build-up SBCs’ efficiency.  In the long term, it might be necessary and possible to establish a joint body to manage the whole Aspara River Basin shared by Kazakhstan and Kyrgyzstan.

Lessons learnt:

  • salinized land was rehabilitated not only thanks to reclamation actions but also by composting. In particular, high-quality humus is produced to enhance soil salinity parameters;
  • the process of designing water use plans for individual farmers launched;
  • one new collector built.

Recommendations:

It is necessary to focus on strengthening the role of local associations in rendering irrigation services and managing the canal’s water level.  Local water users will be rendered an opportunity to design effective irrigation water management schemes.  The experience of decentralized water planning and management accumulated by water tenants will be documented and distributed as a part of knowledge-management (capacity-building) strategy.  It is necessary to closely cooperate with the newly established Agriculture Advisory Service working on sustainable land and water management, as well as to disseminate corresponding practices in other areas.

Source of practice

Foreign tools (transfer of foreign experience)

Domestic tools (outcomes of research by domestic R&D organizations)

Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

Brief information on the project

Development and implementation of basin plans constitute principal elements of integrated water resources management.  Multi-agency coordination mechanism via basin councils or coordination groups is an important advantage of IWRM.  This approach allows streamlined coordination and synergy of actions on all levels of management hierarchy.

Project title: Stakeholder partnership in joint policy-making: assistance to transboundary cooperation in small watersheds of Central Asia.

Project duration: Apr 2012-Oct 2016

Project goal and objectives: introduction of the integrated water resources management (IWRM) practice in three transboundary watersheds and its scaling-up in Central Asia.

Project beneficiaries: communities of the Aspara small transboundary river basin, specialists of water and environmental agencies, farmers.

Project implementer: USAID/CAREC.

Project title: Local-level capacity building and investment for sustainable management of land resources.

Project duration: 2009-2010.

Project goal and objectives: overcoming barriers to higher efficiency and performance of water supply systems in climate change induced drought conditions.

Project beneficiaries: Zakhmet Daikhan Farm (approximately 300 daikhan households).

Project implementer: Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ).

Funding source USAID UNDP and Global Environmental Facility
Information sources

carecnet.org

http://www.turkmenistan.ru/?page_id=3&lang_id=ru&elem_id=17207&type=event&layout=print&sort=date_desc 

Contacts of a person, who filled this form

SIC ICWC

SIC ICWC

Form submission date 02.04.2018 17.04.2018

Partners