On-line data on water discharges of intake structures in the Syrdarya river basin
in vegetation period 2013, m3/sec

Water intake

 

April

May

June

July

August

September

I

II

III

I

II

III

I

II

III

I

II

III

I

II

III

I

II

III

pumping from Naryn

limit

0,77 0,77 0,68 1,47 1,36 1,58
1.92
2.03
2.15
2.15
2.15
2.03
1.81
1.81
1.81
1.77
1.36
1.36

fact

0,62 0,68 0,60 1,40 1,36 1,58
1.85
2.03
2.15
2.15
2.15
2.03
1.81
1.81
1.81
1.77
1.40
1.36

LNC1

limit

5,14 5,71 5,33 6,16 7,01 7,41
9.24
9.86
11.21
12.52
13.42
13.15
11.62
12.47
11.36
8.21
5.45
4.12

fact

4,89 7,60 7,54 9,31 10,10 9,39
9.91
8.36
11.11
11.97
11.97
11.97
11.97
12.73
12.82
11.01
8.69
7.53

BNC2

limit

18,57 18,57 18,57 27,57 28,70 28,70
29.83
29.83
29.83
34.33
34.33
34.33
33.20
28.70
28.70
18.57
18.48
18.48

fact

12,50 25,00 24,20 28,50 30,00 30,00
30.00
26.40
30.00
30.00
34.50
40.00
40.00
40.00
40.00
26.00
20.00
20.00

BFC3

limit

89,29 113,32 134,59 144,36 134,67 129,47
135.18
151.83
166.28
185.05
197.20
194.52
176.27
155.43
126.32
103.44
82.98
86.36

fact

117,56 147,80 160,84 171,01 153,88 110,72
142.69
148.21
142.16
146.40
142.76
172.63
173.70
175.33
135.59
123.32
102.71
115.23

SFC4

limit

34,20 35,10 35,10 39,60 39,60 44,10
49.50
49.50
58.50
63.00
67.50
67.50
63.00
58.50
48.60
38.70
28.80
21.69

fact

63,39 57,60 55,51 53,32 49,20 54,36
54.42
51.65
48.62
44.05
43.27
51.89
51.75
51.25
38.09
37.62
42.20
37.55

till Uchkurgan headwork, total

limit

147,96 173,47 194,26 219,16 211,33 211,25
225.68
243.06
267.96
297.04
314.59
311.53
285.89
256.91
216.78
170.69
137.07
132.00

fact

198,96 238,68 248,68 263,55 244,53 206,06
238.87
236.65
234.05
234.57
234.65
278.52
279.23
281.11
228.31
199.73
174.99
181.67

including Uzbekistan

limit

135,09 158,13 178,20 201,06 190,35 189,54
200.88
218.43
241.65
269.64
287.19
283.23
260.19
230.58
193.14
151.47
121.14
119.25

fact

194,70 230,04 236,82 250,34 233,64 191,84
223.51
220.80
212.84
216.83
217.34
254.10
255.26
257.47
210.54
188.26
164.99
171.85

including Tajikistan

limit

9,90 11,70 12,60 13,50 14,40 14,40
15.30
15.30
15.30
15.30
15.30
15.30
15.30
15.30
13.50
11.70
9.90
8.10

fact

1,10 3,00 6,17 5,60 2,14 3,68
3.94
6.16
8.06
3.54
3.09
9.36
9.09
9.19
3.70
0.87
1.33
2.48

including Kyrgyzstan

limit

2,97 3,64 3,46 4,60 6,58 7,31
9.50
9.33
11.01
12.10
12.10
13.00
10.40
11.03
10.14
7.52
6.03
4.65

fact

3,16 5,64 5,69 7,61 8,75 10,54
11.42
9.69
13.15
14.20
14.22
15.06
14.88
14.45
14.07
10.60
8.67
7.34

diversion from Naryn

limit

0,81 0,90 0,99 2,70 2,70 2,70
3.60
3.78
5.40
5.40
5.40
5.40
5.40
3.78
2.79
1.80
1.80
0.90

fact

0,91 1,00 0,27 2,67 2,70 2,70
3.42
3.70
5.40
5.40
5.40
5.40
5.40
3.95
3.78
2.00
1.80
1.08

Akhunbabayev canal

limit

18,00 18,00 18,00 16,20 16,20 16,20
19.80
22.50
22.50
31.50
36.00
36.00
34.20
27.00
18.00
16.20
13.50
9.01

fact

26,90 22,40 25,25 21,12 16,72 25,41
20.60
19.10
18.00
17.96
27.35
25.55
25.60
24.96
18.36
19.85
23.92
23.62

pumping st.Uzbekistan

limit

3,61 4,51 4,49 6,00 5,41 6,30
7.20
7.20
8.11
8.82
9.01
9.01
7.21
7.21
6.30
4.50
3.60
3.60

fact

6,23 5,97 6,83 13,22 7,43 8,50
6.55
8.66
8.51
8.64
8.36
9.22
9.35
9.41
8.38
4.94
5.53
7.42

pumping st. above Kairakkum (Taj)

limit

0,00 0,00 0,00 0,00 0,00 0,00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

fact

3,16 8,70 10,68 7,91 12,02 13,77
11.16
14.38
13.00
13.60
15.25
11.37
15.56
14.97
14.79
15.75
12.63
5.28

pumping st. from Kairakkum

limit

1,25 12,05 21,39 28,71 26,23 30,72
35.93
40.41
40.54
41.10
41.11
35.25
34.24
31.53
25.94
20.50
19.27
17.22

fact

11,04 11,82 20,20 22,46 25,31 23,92
27.91
26.89
27.85
22.14
29.79
31.21
29.60
24.92
22.46
25.08
20.56
7.00

pumping st. Arkinskaya

limit

1,77 2,08 2,18 2,25 2,59 2,94
3.04
3.04
3.11
3.28
3.32
3.63
3.13
2.76
2.49
2.10
1.97
1.98

fact

1,28 1,59 1,52 1,96 1,86 3,09
3.60
2.72
1.52
1.52
1.65
1.38
1.54
1.12
1.46
1.60
1.28
0.80

till Kairakkum,total

limit

25,44 37,53 47,07 52,78 53,12 58,86
69.56
76.94
79.64
90.10
94.82
89.28
84.16
72.27
55.51
45.09
40.14
32.72

fact

49,52 51,48 64,75 65,73 66,04 77,39
73.24
75.45
74.28
69.26
87.80
84.13
87.05
79.33
69.22
69.22
65.72
45.20

including Uzbekistan

limit

22,41 23,40 23,49 24,30 24,30 25,20
30.60
33.48
36.00
45.72
50.40
50.40
46.80
37.98
27.09
22.50
18.90
13.51

fact

34,04 29,37 32,35 29,34 26,85 36,61
30.57
31.46
31.91
32.00
41.11
40.17
40.35
38.32
30.52
26.79
31.25
32.12

including Kyrgyzstan

limit

3,03 3,33 3,78 4,18 4,52 4,87
5.66
5.66
5.84
6.58
6.62
6.48
5.87
5.49
5.00
4.59
4.14
3.91

fact

1,66 2,86 3,40 3,76 3,66 4,73
5.60
4.75
3.90
3.38
3.90
3.88
4.81
3.77
3.37
3.60
4.08
1.38

including Tajikistan

limit

0,00 10,80 19,80 24,30 24,30 28,79
33.30
37.80
37.80
37.80
37.80
32.40
31.49
28.80
23.42
18.00
17.10
15.30

fact

13,82 19,25 29,00 32,63 35,53 36,05
37.07
39.24
38.47
33.88
42.79
40.08
41.89
37.24
35.33
38.83
30.39
11.70

Lower Dalverzin (Uzb)

limit

16,20 22,50 24,30 24,30 24,30 24,30
27.00
27.00
27.00
28.80
28.80
28.80
27.00
27.00
27.00
13.50
9.18
9.00

fact

20,00 27,00 28,00 28,00 20,30 20,64
23.00
22.90
21.00
21.50
21.50
20.91
22.40
23.80
18.82
19.90
15.70
15.00

Upper Dalverzin (Taj)

limit

4,50 18,00 31,50 31,50 31,50 36,00
36.00
37.80
37.80
37.80
37.80
37.80
37.80
37.80
31.50
22.50
18.00
9.00

fact

0,60 3,43 3,20 14,10 21,53 20,99
26.10
27.10
30.73
31.11
25.87
28.20
31.50
26.20
26.09
24.65
20.90
13.30

Begovat canal

limit

2,70 3,51 3,60 2,70 2,70 2,70
2.70
2.70
2.70
3.60
3.60
3.60
3.60
2.70
2.70
1.80
1.80
1.80

fact

2,00 2,00 2,00 3,90 3,60 3,00
3.00
3.10
5.00
5.00
5.00
5.00
5.00
5.00
3.91
3.00
3.00
3.35

Dustlik canal (KMC)5

limit

58,95 58,95 59,04 60,84 65,34 72,18
130.14
139.14
148.14
157.14
175.14
193.14
155.70
121.14
112.14
14.85
7.83
5.76

fact

39,90 74,10 50,30 44,70 41,70 69,72
98.80
105.80
114.00
136.00
106.37
120.00
146.90
157.70
88.63
63.10
45.40
38.90

SGC canal6

limit

131,49 133,20 143,46 156,78 159,48 174,69
214.92
256.95
256.95
256.95
256.95
256.95
226.35
182.97
116.01
70.29
48.24
28.62

fact

94,90 137,70 121,50 129,30 119,30 142,64
166.40
176.40
203.30
206.50
180.40
196.64
213.40
229.80
202.91
181.70
132.40
108.30

Zafarabad + Mekhnat (Taj)

limit

0,00 27,00 31,50 31,50 31,50 31,50
34.20
36.00
36.00
36.00
36.00
36.00
36.00
36.00
29.70
22.50
9.00
13.50

fact

0,00 0,00 0,00 4,40 22,00 24,91
26.00
26.00
26.00
26.00
26.00
36.18
40.00
40.00
40.00
40.00
30.00
19.70

pumping st. Uzbekistan

limit

7,66 8,02 9,90 10,81 10,80 14,41
17.10
20.71
20.71
21.61
21.61
21.61
18.90
17.11
11.71
6.30
4.06
3.34

fact

6,00 6,20 3,20 1,90 2,80 4,36
5.60
7.00
11.80
12.60
8.40
13.64
15.20
12.00
14.64
12.40
13.60
13.95

till Chardara, total

limit

225,99 280,17 313,20 329,20 336,43 368,38
474.66
532.88
541.89
554.50
572.50
590.47
517.94
437.30
343.34
160.75
107.09
80.01

fact

166,53 253,26 213,96 235,66 240,32 295,40
358.92
379.49
423.07
451.21
387.14
433.95
487.26
504.97
406.83
355.07
268.96
216.09

including Uzbekistan

limit

216,99 226,17 240,30 241,92 244,62 265,77
355.86
401.49
401.49
405.09
405.09
405.09
332.55
260.91
188.55
106.75
71.10
48.51

fact

154,80 238,30 200,40 195,20 175,90 214,91
256.90
275.20
315.10
319.60
279.90
304.27
325.60
334.90
268.55
248.30
207.10
179.50

including Kazakhstan

limit

0,00 0,00 0,00 13,50 18,00 22,50
36.00
45.00
54.00
63.00
81.00
99.00
99.00
90.00
81.00
0.00
0.00
0.00

fact

8,00 8,70 4,60 12,60 11,80 25,45
39.90
40.00
40.00
62.00
41.77
51.91
77.30
93.40
60.36
31.80
3.00
0.00

including Tajikistan

limit

9,00 54,00 72,90 73,78 73,81 80,11
82.80
86.39
86.40
86.41
86.41
86.38
86.39
86.39
73.79
54.00
35.99
31.50

fact

3,73 6,26 8,96 27,86 52,62 55,04
62.12
64.29
67.97
69.61
65.47
77.77
84.36
76.67
77.92
74.97
58.86
36.59

Kyzylkum canal

limit

20,00 20,00 20,00 100,00 100,00 100,00
110.00
110.00
110.00
110.00
110.00
110.00
90.00
90.00
90.00
25.00
25.00
25.00

fact

45,00 33,00 25,00 27,00 35,00 35,91
45.50
50.00
54.50
95.00
108.50
110.00
82.00
44.50
24.09
12.00
5.50
5.00

from Chardara till Aral

limit

fact

Syrdarya (till Chardara)

limit

399,39 491,17 554,53 601,14 600,88 638,49
769.90
852.88
889.49
941.64
981.91
991.28
887.99
766.48
615.63
376.53
284.30
244.73

fact

415,01 543,42 527,39 564,94 550,89 578,85
671.03
691.59
731.40
755.04
709.59
796.60
853.54
865.41
704.36
624.02
509.67
442.96

including Uzbekistan

limit

374,49 407,70 441,99 467,28 459,27 480,51
587.34
653.40
679.14
720.45
742.68
738.72
639.54
529.47
408.78
280.72
211.14
181.27

fact

383,54 497,71 469,57 474,88 436,39 443,36
510.98
527.46
559.85
568.43
538.35
598.54
621.21
630.69
509.61
463.35
403.34
383.47

including Kazakhstan

limit

0,00 0,00 0,00 13,50 18,00 22,50
36.00
45.00
54.00
63.00
81.00
99.00
99.00
90.00
81.00
0.00
0.00
0.00

fact

8,00 8,70 4,60 12,60 11,80 25,45
39.90
40.00
40.00
62.00
41.77
51.91
77.30
93.40
60.36
31.80
3.00
0.00

including Kyrgyzstan

limit

6,00 6,97 7,24 8,78 11,10 12,18
15.16
14.99
16.85
18.68
18.72
19.48
16.27
16.52
15.14
12.11
10.17
8.56

fact

4,82 8,50 9,09 11,37 12,41 15,27
17.02
14.44
17.05
17.58
18.12
18.94
19.69
18.22
17.44
14.20
12.75
8.72

including Tajikistan

limit

18,90 76,50 105,30 111,58 112,51 123,30
131.40
139.49
139.50
139.51
139.51
134.08
133.18
130.49
110.71
83.70
62.99
54.90

fact

18,65 28,51 44,13 66,09 90,29 94,77
103.13
109.69
114.50
107.03
111.35
127.21
135.34
123.10
116.95
114.67
90.58
50.77

LNC1 Ч situated on the left bank of a Namangan canal

BNC2 Ч Big Namangan canal

BFC3 Ч Big Fergana Canal

SFC4 Ч South Fergana Canal

KMC5 Ч Karshi Main Canal

SGC6 Ч South Golodnosteppe Canal