Название практики | Increasing water supply of Aksa-Ayuliye District | Increasing water availability of pastures by constructing sardobas |
---|---|---|
Category | Water resources | Water resources |
Tool | System for enhancing water availability | System for enhancing water availability |
Field of application | Use of water resources |
|
Usability of practice for adaptation to climate change | Moderate | Moderate |
Implemented by | UNDP, UNECE and Water Resources Committee of the Ministry of Agriculture of the RK jointly with the Public Association “Association of Country Farms of Shet Dis-trict of Karaganda Region” |
Ministry of Nature Conservation of Turkmenistan |
Used by |
Country: Kazakhstan Province: Karaganda Region District: Shet District Other settlement: Aksa-Ayuliye Rural District |
Country: Turkmenistan |
Local specifics | The site is located in the area of acute shortage of irrigation and drinking water |
17,238 ha of barkhan (sand dune), takyr (dry-type playa) and solonchak (moist-type playa) sites of the Kara Kum Desert; deep ground water occurrence |
Practice usage period |
Start date: 01.01.2015 End date: 31.12.2015 |
Start date: 01.01.2012 End date: 31.12.2016 |
Problem solved through this practice | Acute shortage of irrigation water |
Desertification and decreased productivity of desert pastures due to over-grazing around existing cattle watering sites |
Tools used in the practice | Measures to restore natural springs: arrangement of stone protection fencing around springs and installation of water-release pipes |
Technology of building sardobas (stone-dome covered water collection and storage reservoirs) to enhance pasture water supply |
Description of the practice and its results | Actions Results Technical |
Main actions:
Actions:
Results:
|
Lessons learnt and recommendations made | Lessons learnt: Recommendations: |
Lessons learnt: Construction of sardobas in takyr areas allows enhancing pasture water supply, thus, leading to the restoration of over-grazed pastures. Recommendations: The practice requires long-term planning and an integrated response with the early-on engagement of desertification experts (designing a set of measures to protect takyrs from sand drifts), state agencies (technical assistance) and pasture users (observance of pasture rotation schemes, prevention of takyrs from contamination and pollution). |
Source of practice | Domestic tools (outcomes of research by domestic R&D organizations) |
Traditional tools transferred from generation to generation that proved their efficiency in modern conditions |
Readiness for implementation |
1. Cost of implementation: High 2. Approximate cost of investment per 1 ha: 3. O&M costs: High 4. Expert support: Not needed |
1. Cost of implementation: Low 2. Approximate cost of investment per 1 ha: $1,000-5,000 3. O&M costs: Low 4. Expert support: Needed at implementation stage |
Brief information on the project | Project title: SaveH2Okz Project within the framework of the joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model” Duration: 2015-2018 Project goal and objectives: raising awareness on the issue of water resources exhaustion with the aim of fostering “green economy” practices Project beneficiaries: local population Project implementer: Ministry of Agriculture of the Republic of Kazakhstan |
Project title: Responding to climate change risks for dekhan farming system of Turkmenistan on national and local levels. Project duration: 2012-2016. Project goal and objectives: build the adaptation capacity to respond to climate change impacts, including variability on local and national levels. Project beneficiaries: Bori Settlement (over 1,100 people) and Bo-Kurdak Settlement (about 4,500 people). Project implementer: Ministry of Nature Conservation and UNDP |
Funding source | European Union (grant) | Government of Turkmenistan, Adaptation Facility |
Information sources | Joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model” sponsored by the European Union (saveh2o.kz) |
|
Contacts of a person, who filled this form | SIC ICWC |
SIC ICWC |
Form submission date | 29.03.2018 | 04.04.2018 |