Название практики Application of tubular outlet flowmeters Improving reclamation condition of arable land around West Karmakshi Collector
Category Water resources Water resources
Tool Means and methods of water accounting Collector-drainage system
Field of application

Use of water resources

• Use of water resources
• Use of land resources

Usability of practice for adaptation to climate change Moderate Moderate
Implemented by Institute of Water Issues, Hydropower and Ecology of the Academy of Sciences of the Republic of Tajikistan (IWIHE of the AS of the RTj)

Used by

Country: Tajikistan

Province: Khatlon Region

District: Jilikul

Country: Kazakhstan

Province: Kyzylorda Region

District: Karmakshy District

Other settlement: a/o “Aktobe”, a/o “III International”

Local specifics
  • Located in the valley part of the Vakhsh River Basin (river catchment area);
  • Deep (below 3 meters) ground water occurrence;
  • Middle loamy soils.

The site is located in the lower reaches of the Syr Darya River (inter-riverbed depression strip)

Practice usage period

Start date: 01.04.2010

End date: 31.10.2011

Start date: 01.01.2010

End date: 31.12.2011

Problem solved through this practice

Uneven distribution of irrigation water, lack of water accounting means to ensure observance of recommended irrigation norms for cotton

Increasing secondary land salination, deterioration of col-lector and drainage system (CDS)

Tools used in the practice

Tubular water outlet flowmeter

A set of measures to enhance land reclamation condition (collector cleaning using special equipment, reconstruction of hydraulic engineering installations, etc.)

Description of the practice and its results

Actions:

- Construction of tubular water outlet flowmeter with removable nozzles (procurement of polyethylene piping to make tubular water outlets and matching nozzles);
- Installation of tubular water outlet flowmeter along temporary sprinklers. 

Results:

Financial and economic:

saving of irrigation water; low cost of irrigation system automation (total kit cost: $500/ha) with the service life of 5 years. 

Technical:

simple design allowing a more even distribution of irrigation water stream among furrows, thus, ensuring the prescribed water supply mode.

Social:

improved working conditions of irrigators; lower labor needs/costs; enhanced mutual trust among farmers and water users.

Actions:
The capital repair of inter-farm West Karmakshi Collector (WKC) is necessitated by the fact that in its current condition the Collector didn't provide for timely drainage of drainages and discharge water from cropland in the Left-Bank Massif.

Results:

Financial and economic:
Increased crop productivity, mainly rice and forage crops

Technical:
Enhanced reclamation condition of land in the Left-Bank Massif

Lessons learnt and recommendations made

Lessons learnt:

Installation and deployment of tubular water outlet flowmeter allows to improve the uniformity of irrigation stream’s distribution among furrows and conduct irrigation water accounting.

Recommendations:

It is necessary to widely use the small-scale irrigation automation means like the tubular water outlet flowmeters which have simple design, are convenient to operate, are low-cost and mobile and ensure supply of the prescribed amount of irrigation water.

Lessons learnt:
Allocation of resources for cleaning CDS proved more efficient than other target actions

Recommendations:
Regular and timely execution of running and capital collector cleaning is necessary to ensure its proper operation

Source of practice

Domestic tools (outcomes of research by domestic R&D organizations)

Domestic tools (outcomes of research by domestic R&D organizations)

Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

Brief information on the project

Project title: Watering technology based on tubular water outlet flowmeters.

Project duration: Apr 2010-Oct 2011.

Project goal and objectives: development and deployment of a crop watering technology for dekhan farms of the Republic of Tajikistan allowing to significantly increase the efficiency of water use.

Project beneficiaries: members of “Istikol” WUA (Water User Association).

Project implementer: Institute of Water Issues, Hydropower and Ecology of the Academy of Sciences of the RTj

Funding source “Tajikistan Water Partnership” NGO Ministry of Reclamation and Water Management of the Republic of Kazakhstan
Information sources

Report by the Innovation Technology Department of the IWIHE of the AS of the RTj, Dushanbe, 2012, 45 p.

Contacts of a person, who filled this form

SIC ICWC

SIC ICWC

Form submission date 02.04.2018 29.03.2018