A3.02. Basin Management Plans

A Basin Management Plans (BMP) is an action-oriented framework document that describes how water and related land resources should be developed and managed in a specifically defined catchment area. This Tool outlines what are BMP, describes what are the key components, design principles, and steps required to develop concrete management plan at river basin or lake basin level.

What are Basin Management Plans?

Water flows according to natural characteristics and does not respect administrative boundaries – therefore, from a water resources point of view, it makes most sense to plan and manage water according to basin boundaries. A Basin Management Plan (BMP) lays out key objectives as well as the programmes and measures needed to achieve these goals. BMPs take into account how different actors across the basin take decision that impact the quality and quantity of available water resources in the given catchment (e.g., enterprises, community-based organisations, government authorities, farmers). Basin organisations can be seen as custodians of the BMPs, though the development and design of the plan should steam from multi-stakeholder consultation processes (Tool B3.05). BMPs thus need to be regularly updated with the ever-changing socio-hydrological environment. The processes after the BMP are then guided through the plan as everything that needs to be implemented and how is listed within it.

Components of BMPs

BMPs should include the following key components (WFD, 2000: 43; INBO and GWP, 2009):



Design Principles

Here are a list of important principles that should be kept in mind while designing a BMP (INBO and GWP, 2009: 76):



Steps to Develop a BMP

Different ways of developing a BMP have been tried around the world. The general idea is to establish a spiral process with several steps on each loop every single loop builds upon lessons learnt and feedback from previous ones, following a DPSIR ("drivers-pressures-state-impact-response") framework. The main key steps in developing and implementing a BMP can be summarised as follows: