Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp53.8015.3227.0519.9113.3324.5563.9181.6384.6788.3085.4369.07153.96473.01626.97
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.000.000.000.000.00179.41459.67743.70767.64615.34252.000.003017.763017.76
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)53.8015.3227.0519.9113.3324.5563.9181.6384.6788.3085.4369.07153.96473.01626.97
Available water for irrigated landK_irr=W_irr/WN_irr1.001.000.000.000.000.000.170.000.090.090.090.182.000.622.62
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.000.000.000.000.00179.41439.50743.70767.64615.34252.000.002997.592997.59
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)22.710.770.000.000.000.0021.270.0040.1441.7636.0131.4223.48170.60194.08
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)39.291.330.000.000.000.0036.790.0069.4272.2362.2954.3440.62295.07335.69
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth39.291.330.000.000.000.0036.79-20.1869.4272.2362.2954.3440.62274.89315.51
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr4.511.461.351.351.351.356.690.3910.3010.619.518.6311.3746.1357.50
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E5.372.292.852.482.152.728.195.7311.1911.5410.819.5017.8656.9674.82
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.860.831.501.140.801.371.515.340.900.941.300.876.5010.8617.36
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was5.372.292.852.482.152.728.195.7311.1911.5410.819.5017.8656.9674.82
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00