Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp45.8913.9927.0519.9113.3324.5563.9181.6384.6788.3085.4369.07144.72473.01617.73
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.000.000.000.000.00247.29455.07614.67734.43608.84275.530.002935.832935.83
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)45.8913.9927.0519.9113.3324.5563.9181.6384.6788.3085.4369.07144.72473.01617.73
Available water for irrigated landK_irr=W_irr/WN_irr1.000.000.000.000.000.000.130.000.100.090.090.161.000.571.57
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.000.000.000.000.00247.29434.89614.67734.43608.84275.530.002915.652915.65
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)18.140.000.000.000.000.0021.270.0040.1441.7636.0131.4218.14170.60188.74
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)31.380.000.000.000.000.0036.790.0069.4272.2362.2954.3431.38295.07326.45
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth31.380.000.000.000.000.0036.79-20.1869.4272.2362.2954.3431.38274.89306.27
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr3.871.351.351.351.351.356.690.3910.3010.619.518.6310.6246.1356.75
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E4.732.182.852.482.152.728.195.7311.1911.5410.819.5017.1156.9674.07
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.860.831.501.140.801.371.515.340.900.941.300.876.5010.8617.36
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was4.732.182.852.482.152.728.195.7311.1911.5410.819.5017.1156.9674.07
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00