Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp14.5113.9927.0519.9113.3329.6263.9181.6384.6788.3085.4355.58118.41459.52577.93
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.000.000.000.000.00368.47520.07753.55656.78409.740.000.002708.612708.61
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)14.5113.9927.0519.9113.3329.6263.9181.6384.6788.3085.4355.58118.41459.52577.93
Available water for irrigated landK_irr=W_irr/WN_irr0.000.000.000.000.001.000.090.000.080.100.131.001.001.402.40
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.000.000.000.000.00368.47499.89753.55656.78409.740.000.002688.432688.43
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)0.000.000.000.000.002.9321.270.0040.1441.7636.0123.622.93162.80165.73
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)0.000.000.000.000.005.0836.790.0069.4272.2362.2940.865.08281.59286.67
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth0.000.000.000.000.005.0836.79-20.1869.4272.2362.2940.865.08261.41266.49
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr1.351.351.351.351.351.766.690.3910.3010.619.517.148.5144.6453.15
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E2.212.182.852.482.153.138.195.7311.1911.5410.818.0115.0055.4770.47
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.860.831.501.140.801.371.515.340.900.941.300.876.5010.8617.36
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was2.212.182.852.482.153.138.195.7311.1911.5410.818.0115.0055.4770.47
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00